20 x 30 slab at 4 inches
Concrete needed, with a 7 percent waste allowance, rounded up.
In metric, that is about 6.1 × 9.14 m at 10.2 cm, roughly 6.06 m³ of concrete.
Open the interactive Concrete CalculatorAbout this slab
A 20 by 30 foot slab at 4 inches works out to 200 cubic feet, or 7.41 cubic yards before waste. We add 7 percent for spillage and uneven subgrade and round up to whole bags. An 80 lb bag yields about 0.60 cubic feet, a 60 lb bag 0.45, and a 40 lb bag 0.30.
Always confirm the order with your supplier. Subgrade that is not level, over excavation and thickened edges all add volume.